The estimated range
The estimated full-size recovery, shown beside your lab result.
Illustration. No real figures.
Scale-up checks for metal extraction projects
We estimate the full-size plant’s recovery from the lab tests you already have.
For investors, developers and operators with lab tests in hand.
Bench leach tests or lab flotation tests. The ones you already have.
Leaching: time in the tanks, mixing and oxygen. Flotation: particle size, bubbles and froth.
Every report is reviewed before it goes out.
The estimated range, the risks behind it and the next test.
Lab to plant.
A lab test is small and tightly controlled. A full-size plant is not.
Time in the tanks. In a chain of tanks, some slurry leaves early, before it has had the full leach time.
Mixing. As tanks grow, there is usually less mixing power for each cubic metre of slurry.
Oxygen. Where the leach needs oxygen, a big tank may get less of it into the liquid than a small, well-stirred beaker.
Particle size. A plant may grind coarser than the lab sample, and coarser particles leach more slowly.
All four at once. Together, they can make the full-size result fall short of the lab’s.
Illustration, not to scale. As copper dissolves, the particles turn grey and the liquid turns blue. No real rates or figures.
At million tonnes of ore a year, % copper and US$ a tonne,
Type over any figure to try your own project.
one point of recovery is worth $5 million a year, or 500 t of copper.
Copper in the ore: 50,000 t a year. One point of recovery is 1 % of it. Gross metal value, before smelter terms and costs. What you type stays in your browser.
The estimated full-size recovery, shown beside your lab result.
Illustration. No real figures.
For example:
Which test to run first, before you commit to a pilot.
A short call, then a fixed quote. Book a call
Built on published engineering models, with a metallurgist’s review on every report.
Leaching
Adjusts bench leach tests for time in a chain of tanks, weaker mixing in big tanks and how much oxygen reaches the liquid.
Working prototype.
Flotation
Adjusts lab flotation tests for particle size, bubbles and froth in big cells, and banks of cells in series.
Earlier-stage prototype.
If you have bench leach tests or lab flotation tests, and a decision ahead on a plant, it may be. Send a short note about the process, the tests you have and the decision ahead, and we’ll tell you.
Not to start. A short note or a call is enough. Before you send any lab reports, we agree with you how they will be protected.
Each check has a fixed fee, which depends on the project. A short call, then a fixed quote.
Each report gives an estimated range rather than a single number, with the risks behind it. Both engine modules are still prototypes, and external blind validation is our next milestone.
A check doesn’t stand in for a pilot. It helps you decide which projects deserve one, and which test to run first.
No. We do not sell or license our software. You receive a report, and we can walk you through how the engine works on a call.
Tell us about the project, the tests you have and the decision ahead. We’ll reply by email to arrange a call. Or pick a time yourself.